The Installation Process - 5 Steps to Going Solar
1. Contact GeoInnovation to perform an on-site evaluation
- Determine historical energy use from electric bills
- Determine roof area available for photovoltaic panels
- Select location for photovoltaic panels, solar inverter, and production meter
- Discuss costs for various system sizes
- Discuss installation timing
2. Decide to Go Ahead with Photovoltaic Installation
- Submit application to electric utility
- Sign contract with electric utility
- Sign contract with GeoInnovation
3. GeoInnovation Installs System
- Generate design drawings and pull permit
- Install system on scheduled week
- County or City inspects system once installation is complete
4. Utility Sends Rebate Check
- 6 to 8 Weeks after Inspection of System
|
 |
5. Enjoy decades of environmentally friendly and maintenance-free electricity! |
|